New York Record
Mount Vernon

Mount Vernon · week of October 31, 2026

Planning Commission takes up One-year extension of time — 405 South Fifth Avenue (PB-26-16)

Summarized from the official meeting transcript — every claim links to the moment it was said. How we make this

What changed in Mount Vernon

  • One-year extension of time — 405 South Fifth Avenue (PB-26-16)

    0 yes, 0 no, 1 abstain

    Lesley Zamor (abstain)

    Watch this moment →
  • One-year extension of time — 454 South Ninth Avenue (PB-26-15)

    0 yes, 0 no, 1 abstain

    Lesley Zamor (abstain)

    Watch this moment →
  • SEQRA negative declaration — Boys & Girls Club clubhouse (PB-26-11)

    0 yes, 0 no

    Watch this moment →
  • Site plan and reapportionment approval — 50 East First Street, Boys & Girls Club clubhouse (PB-26-11)

    0 yes, 0 no

    Watch this moment →
  • Site plan approval — 10 East Prospect Avenue cannabis dispensary (PB-26-13)

    0 yes, 0 no

    Watch this moment →
  • Site plan approval — 22 Brookfield Road, Westchester Muslim Center canopy (PB-26-12)

    0 yes, 0 no

    Watch this moment →
  • Continuation of public hearing — 40 Locust Lane, Bronxville Field Club paddle court (PB-26-8)

    0 yes, 0 no

    Watch this moment →

Development activity

  • Bronxville Field Club Alterations

    40 Locust Lane, Mount Vernon, NY

    A fourth paddle court 44 feet from the property line plus restriping the parking lot from 53 to 66 spaces — no new impervious surface, but neighbors turned out in force over flooding, noise and parking.

    still continued

    Track this project →
  • 405 South Fifth Avenue — Extension of Time

    405 South Fifth Avenue, Mount Vernon, NY

    A one-year extension of a 2023 site plan approval for four attached townhouse units; construction hasn't started because sewer-line replacement blocked the required flow testing.

    approved · still approved

    Track this project →
  • Westchester Muslim Center Permanent Canopy

    22 Brookfield Road

    Legalizing an already-built ~2,600 sq. ft. canopy erected without a permit after a storm destroyed the mosque's tent — approved for school children during school hours only, with building department review required.

    still conditions-required

    Track this project →
  • 10 East Prospect Avenue Cannabis Dispensary

    10 East Prospect Avenue, Mount Vernon, NY

    Conversion of long-vacant retail into a cannabis dispensary — approved with fire/building department conditions and 10 a.m.–10 p.m. hours after a hearing that turned into a debate over the board's legal authority.

    still conditions-required

    Track this project →
  • Boys & Girls Club of Mount Vernon Clubhouse

    50 East First Street

    A two-story clubhouse with classrooms, teen center, media studio, maker lab and gym on four merged tax lots — approved with a pedestrian-safety signage condition and a SEQRA negative declaration.

    still conditions-required

    Track this project →
  • 454 South Ninth Avenue — Extension of Time

    454 South Ninth Avenue, Mount Vernon, NY

    A one-year extension of a 2023 approval for four two-family dwellings; the owner simply never did the required sewer scoping, per the engineer.

    approved · still approved

    Track this project →

Also discussed

  • Boys & Girls Club Downtown Redevelopment

    The club's new two-story home — classrooms, teen center, media studio, gym — got the green light as the anchor of the downtown transit-oriented arts district. The board made the club talk with the traffic bureau about slow-down signage where kids cross at East First and South First.

    What it means: Mount Vernon's kids and teens get a modern clubhouse, and downtown gets a long-sought anchor.

    Follow this issue →
  • Stalled Development Projects and Final Deadlines

    Two previously approved multifamily projects — two units at 405 South Fifth Avenue and four at 454 South Ninth Avenue — still haven't pulled building permits since their 2023 approvals. The Board will decide whether to grant more time.

    What it means: The applicants, who would keep their approvals alive and preserve the ability to build.

    Follow this issue →
  • 140 E Prospect New Application

    Daniella Realty Corp wants to convert existing retail space at 10 East Prospect Avenue into a cannabis dispensary. The hearing will shape whether the city's downtown business corridor gains its first such use.

    What it means: The property owner and the dispensary operator, plus the downtown corridor if the retail space is activated.

    Follow this issue →
  • Legalization and Permitting of Westchester Muslim Center Canopy

    The mosque's permanent canopy — built without a permit after storm damage to its tent — was approved, but strictly for school children during school hours. Neighbors say photos show dinners and events in the space; the board's answer: any other use needs a separate permit, and the building department will check occupancy limits.

    What it means: Mosque school kids get a weather-protected play space; the mosque gains legal certainty.

    Follow this issue →
  • Retail Cannabis Dispensary on East Prospect Avenue

    A legal retail cannabis dispensary in a vacant downtown storefront won approval — but only after its lawyer warned the board it can't demand 'give-backs' or block a legal use. Security is extensive: buzz-in doors, 4K cameras shared with police, and hours capped at 10 a.m.–10 p.m.

    What it means: The applicant cites a $1.6 million donation to the school system and years of local investment — figures not yet verified by the board.

    Follow this issue →
  • Bronxville Field Club Expansion and Parking

    Not decided. Neighbors brought photos, an engineering report and years of grievance — flooding on Denman Place, paddle noise past 10 p.m., cars lining Carll Avenue.

    What it means: Residents say they've spent thousands on engineering consultants; the club once offered $450,000 toward a flooding remediation study, per testimony.

    Follow this issue →

Published by New York Record. 1 meeting covered.