Karis Memory Care at Bellfield Development
Summary
A 14,000-square-foot, 28-bed memory care facility on St. Andrews Road within the Bellefield project. It brings specialized eldercare to town but raised concerns about stream corridor protection, landscaping along St. Andrews, and pedestrian safety on the future walkway.
At a glance
- Total mentions
- 10
- Last 30 days
- 1
Rising — discussed at 3 meetings since Sep 16, 2026, up from 2 in the two months before.
Impact analysis
The project is part of the larger Bellefield development, which carries a PILOT arrangement the board discussed for its phased tax implications.
Families seeking memory care services locally, plus the Bellefield development overall.
Nearby residents concerned about construction impacts on the undisturbed stream corridor.
Mentions & discussions (10)
Planning Board (Regular) - Nov 4, 2026
A 14,000-square-foot, 28-bed memory care facility on St. Andrews Road within the Bellefield project. It brings specialized eldercare to town but raised concerns about stream corridor protection, landscaping along St. Andrews, and pedestrian safety on the future walkway.
Planning Board (Regular) - Oct 7, 2026
Developers presented site plan and architectural updates for a 14,000-square-foot memory care facility within the Bellfield development, sparking discussion on landscaping, utility placement, and building aesthetics.
Planning Board (Regular) - Sep 16, 2026
Developers are finalizing building layouts, lighting, and emergency access for Phase 4 condos in coordination with the local fire district.
Planning Board (Regular) - Sep 2, 2026
Developers of the Bellfield condos updated their plans to satisfy fire department egress concerns and discussed how to phase recreational trail amenities alongside building construction.
Planning Board (Regular) - Jul 15, 2026
Developers presented detailed plans for the Bellfield Phase 4 condominiums and townhomes and the Karis Memory Care facility, focusing on architecture, pedestrian walkability, active recreation amenities, and stormwater management.
Planning Board (Special) - Jun 25, 2026
Developers presented updated plans for Phase 4 of the Belfield project, featuring adjustments to unit counts, new interior courtyard designs, parking shifts, and stormwater pond configurations.
Planning Board (Regular) - Jun 3, 2026
The Belfield project team presented comprehensive updates for phase four condominiums, townhouses, stormwater ponds, and subdivision lot lines, focusing on architectural quality and neighborhood connectivity.
Planning Board (Regular) - May 6, 2026
Developers of Cares Memory Care presented refined site plans and architectural elevations, receiving feedback on materiality, stormwater management, and pedestrian sidewalk connections.
Planning Board (Regular) - Feb 4, 2026
The development team for Carers Memory Care reconfigured their building into an L-shape to better accommodate Roosevelt Fire District apparatus access and coordinate complex sanitary sewer and stormwater infrastructure.
Planning Board (Regular) - Jan 7, 2026
The board reviewed extensive landscaping plans, trail layouts, conservation easements, and subdivision infrastructure for the Bellfield project.
Related development
Karis Memory Care at Bellfield
Provides specialized senior healthcare housing with dedicated architectural and landscaping features.
Carers Memory Care
Provides specialized senior care housing while navigating complex utility and emergency access requirements.
Cares Memory Care at Belfield
Provides specialized senior care housing within the Belfield PUD with enhanced pedestrian connections.
We'll email you when it's on an upcoming agenda and when it's voted on, at most once a day.
The weekly brief for Town of Hyde Park
What the council decided, in plain English — one email a week.
Free. Unsubscribe with one click any time. We never sell your email.